Construction site checklist.
What to settle before the crew arrives, what to set up on day one, and the jobs that run every day after, each tied to the federal rule behind it. Tick items as you go; your progress stays in this browser.
Drop that needs a chute
Barricade height
Area per 2A extinguisher
Trench depth that needs egress
Before mobilization
Calls and counts to settle first.
Federal minimums. States, cities, owners and contracts can ask for more.
Day one on site
Three setups that depend on the work.
Every day
The list that never really ends.

Where we come in
Most of this list arrives on a truck.
Toilets, dumpsters, water, fencing, washout and power, from local providers on one schedule and one bill.
Portable toilets and hand wash
Counted to the shift, serviced on a schedule.
Dumpsters
Sized to the debris, swapped as you fill them.
Water delivery
Drinking water on a schedule.
Temporary fencing
Perimeter and excavation barricades.
Concrete washout
A leak-proof container for every pour.
Office and power
A site office and the generator to run it.
Next step
Send us the start date and the address.
We’ll set up toilets, dumpsters, water, fencing and power with local providers, on one schedule.
Questions
Questions about the checklist.
Does OSHA require a dumpster on a construction site?
OSHA asks for containers to collect and separate waste and for garbage to be disposed of at frequent and regular intervals. It doesn't name a container type, so a dumpster is the usual way to do it, not the only one.4
When does a site need a stormwater permit?
When construction disturbs 1 acre or more, or less than 1 acre that's part of a larger common plan that will reach 1 acre.1
How many fire extinguishers does a jobsite need?
One rated 2A for each 3,000 square feet of building area, with no more than 100 feet to walk to one, and at least one on each floor. A 10B extinguisher is added within 50 feet of larger amounts of flammable liquid or gas.5
Can I throw debris off the roof into a dumpster?
Not from more than 20 feet up unless it goes through an enclosed chute.6
Is this checklist complete?
No. It covers common site setup items from the federal rules linked below. Fall protection, scaffolds, electrical and the rest of Part 1926 aren't on it, and it isn't legal advice.
Read next
Sources
- U.S. EPA, Stormwater Discharges from Construction Activities. Checked October 29, 2026. epa.gov
- 29 CFR 1926.651, Specific excavation requirements. Checked October 29, 2026. ecfr.gov
- 29 CFR 1926.51, Sanitation. Checked October 29, 2026. ecfr.gov
- 29 CFR 1926.25, Housekeeping. Checked October 29, 2026. ecfr.gov
- 29 CFR 1926.150, Fire protection. Checked October 29, 2026. ecfr.gov
- 29 CFR 1926.252, Disposal of waste materials. Checked October 29, 2026. ecfr.gov
- OSHA standard interpretation, May 17, 2006, on whether toilets must be sanitary to meet 29 CFR 1926.51(c). Checked October 29, 2026. osha.gov