Georgia
For facilities, procurement, and project managers with sites in Georgia. You get the network, the deliveries, and the state rules that change the buy.
Last reviewed October 27, 2026.
Local haulers do the work; we hold the contract, own the problems, and send one bill. One agreement can hold roll-off dumpsters, portable toilets, and restroom trailers for every Georgia site. If you’re weighing us against a single hauler, here’s how a broker, a hauler, and our provider network differ.
See how an order is sourced, priced, dispatched, and billed, or multi-site facilities for a portfolio that crosses more than one state.
The network
At Georgia job sites, October 26, 2024 through October 26, 2026 · Published figure
Figures are counts of completed deliveries, providers, and accounts in this window from our records, as of October 2026. Roll-off deliveries are containers delivered. Portable toilet deliveries are units placed, not orders. A company that completed both services is counted in both service rows, so those rows are not a split of the provider total. The counts are not a promise that every address is covered. Front-load service, compactors, and balers are not in these counts.
State rules
What follows is a buyer’s summary of the Georgia rules that change the buy. It is not legal advice, so check the current text and the site’s local ordinance before you rely on it.
The Georgia Environmental Protection Division’s solid waste management rules define construction/demolition waste as waste building materials and rubble from construction, remodeling, repair, and demolition. The definition covers non-putrescible wastes with a low potential for groundwater contamination. A construction/demolition waste landfill may also receive inert waste and yard trimmings. Rule 391-3-4-.02 requires a solid waste handling permit from the Director before a person engages in solid waste handling or constructs or operates a solid waste handling facility, except for the exemptions in the state solid waste statute and a permit-by-rule under those rules. The facility’s permit can be narrower than the rule, and a landfill can refuse a waste the rule would allow. Confirm acceptance with the facility before the haul.
Georgia Department of Public Health Rule 511-3-6 regulates temporary portable sanitation units and the people who furnish, rent, and service them. Rule 511-3-6-.03 requires a Waste Removal and Disposal Permit from the county health authority where the business is based. The permit is renewed annually and is valid in every county in the state. A construction site owner who uses a portable sanitation unit must show a service contract with a certified portable sanitation company. The rule sets the minimum number of units at a construction site by the current OSHA regulations for toilets at construction sites. Construction crew counts are on the OSHA portable toilet requirements guide.
O.C.G.A. section 32-4-91 says a municipality shall plan, designate, improve, manage, control, construct, and maintain its municipal street system, and has control of construction, maintenance, and other work on that system. O.C.G.A. section 32-6-1 makes it unlawful to obstruct or encroach upon any part of a public road. On a municipal street, the local governing authority can recover the cost of removing the obstruction. A roll-off on a municipal street is that city’s question. A state highway right-of-way is a separate permit.
Run trucks in Georgia? Start at vendor support; the vendor payment guide covers how and when we pay.
Answers
Who permits a dumpster on a Georgia street?
A municipality controls its municipal street system under O.C.G.A. section 32-4-91. Section 32-6-1 makes it unlawful to obstruct or encroach upon a public road, and the local governing authority can recover removal costs on a municipal street. A roll-off on a municipal street is that city's question. A state highway right-of-way is a separate permit.
Where can construction debris from a Georgia job go?
The Georgia Environmental Protection Division's solid waste management rules define construction/demolition waste as waste building materials and rubble from construction, remodeling, repair, and demolition. The definition covers non-putrescible wastes with a low potential for groundwater contamination.
Who may pump portable toilets in Georgia?
Georgia Department of Public Health Rule 511-3-6 regulates temporary portable sanitation units and the people who furnish, rent, and service them. Rule 511-3-6-.03 requires a Waste Removal and Disposal Permit from the county health authority where the business is based.
What payment terms can a Georgia account get?
The Georgia sites go on one agreement and one invoice, for roll-offs, portable toilets, and restroom trailers alike. Approved accounts can be offered Net 30, 60, or 90, subject to credit review. Nothing on this page is an offer of credit. See the terms of use.
Talk to us
The address list and what each site needs are enough for us to quote the whole Georgia portfolio together.
Metro pages
Street rules for the metro pages linked below are stated on those pages.
AtlantaMetro pageAugustaCity pageSources