CONSTRUCTION WASTE MANAGEMENT PLAN Outline. Fill in the blanks. This is not a completed plan and it is not a LEED submittal. 1. Project Name: Address: Building floor area, if a generation cap applies: General contractor: Person responsible for the plan and the final report: Rating system, if any (LEED v4 BD+C, LEED v4.1 BD+C, or none): Credit path being pursued: Municipal or state permit requirement, if any (jurisdiction and citation): 2. Diversion goal Target diversion rate: Minimum number of material streams: Unit of measure for the whole plan (weight or volume, one only): 3. Materials targeted for diversion List at least five, both structural and nonstructural. For each material: - Structural or nonstructural: - Separated on site, or commingled: - Hauler: - Receiving facility: - How that facility will process the material: - Expected diversion rate for this stream: 4. Excluded from the diversion calculation Excavated soil: Land-clearing debris: Hazardous waste (its own paperwork; not part of this rate): 5. Alternative daily cover ADC counts as waste, not as diversion. Facility rate with ADC removed: 6. On-site handling Where bins sit, and who keeps them from being contaminated: Streams that change by construction phase: 7. Tracking Who collects weight tickets or receipts: Fields each ticket must show: date, facility, material, weight or volume, ticket number, diverted or disposed Where tickets are filed, by container and by site: How often the rate is recalculated before closeout: 8. Final report For each major stream: generated, diverted, disposed, rate, facility Project diversion rate: Material streams that count, and why each one qualifies: Tickets attached: