15 yard dumpster
About 405 cubic feet, or six and a half pickup truck loads, on a footprint about the length of a 10. It's the middle size for a big bathroom, a small deck, a mid-size roof or a cleanout that's past a 10.
Last reviewed October 27, 2026.
Dimensions
A pickup truck load is a standard 6½ ft truck bed filled level, about 2.3 cubic yards.
Most 15-yard quotes include 2 to 3 tons, and 2 tons is both the median and the most common figure. That's from 1,030 15-yard orders with tons on the quote, out of 1,066 15-yard deliveries our provider network made from October 2024 through October 2026.3
Is a 15 the one?
A 300 sq ft deck is about 11 cubic yards and 1 ton. Five or six pickup truck loads of household junk fit with room to spare.
A single-layer roof of 20 squares is about 7 cubic yards and 2.4 tons, over the typical 2 tons included. Ask for 3 tons on the quote.
Use a 10 quoted for heavy debris. On our 10-yard orders for these loads, the median was 10 tons included.
Fit check
A 15 fills the gap between a 10 and a 20. Set your material and volume to see whether it carries the job on the usual 2 tons, or whether a size either side does it better.43
Your load
Within a typical quoteFits, with weight to spare.
About 1.9 tons of mixed construction, inside the typical 2 tons included on a 15. You would reach 2 tons at about 9 cubic yards.
Either side
| Size | Length | Width | Height | Volume | Tons included |
|---|---|---|---|---|---|
| 10 yard | about 14 ft 9 in | about 8 ft | about 4 ft | 270 cu ft | 1 to 3 |
| 15 yard (this page) | 14′9″ to 16′9″ | about 8 ft | 4′7″ to 4′10″ | 405 cu ft | 2 to 3 |
| 20 yard | 22′9″ to 23′ | 7′9″ to 8′ | 4′3″ to 4′7″ | 540 cu ft | 2 to 4 |
About the length of a 10 with half again the volume. A 20 is the fallback where no one stocks 15s.13
Weight versus room
Household trash and lumber fill a 15, or come close, before they weigh 2 tons. Drywall and shingles get there with about 40 to 60% of the box still empty.43
| Debris | Lb per loose cu yd | In a 15 at 2 tons |
|---|---|---|
| Clean lumber | 169 | Fills by volume first; level full is about 1.3 tons |
| Household trash | 275 | Reaches 2 tons at about 14.5 cu yd, 97% full |
| Mixed construction | 417 | Reaches 2 tons at about 9.6 cu yd, 64% full |
| Drywall | 467 | Reaches 2 tons at about 8.6 cu yd, 57% full |
| Asphalt shingles | 731 | Reaches 2 tons at about 5.5 cu yd, 36% full |
Need a material that isn't listed? The debris weight calculator covers 20 of them, heavy ones included.
On site
A 15 is about as long as a 10, 14 ft 9 in to 16 ft 9 in, with walls of 4 ft 7 in to 4 ft 10 in. It fits spots a 20 won’t, and you can still load it over the side.1
When the truck sets the box down, its hoist rises about 18 to 20 ft above the ground. Check for branches, eaves and wires over the spot, and stay at least 10 ft from power lines.56
At about 240 lb a square, a single-layer roof reaches 2 tons at about 16 squares. On a bigger roof, ask for 3 tons on the quote.7

About the length of a 10 with taller walls: 14 ft 9 in to 16 ft 9 in long, about 8 ft wide and 4 ft 7 in to 4 ft 10 in tall outside. Inside, the walls are 3 ft 7 in to 4 ft.
Most quotes in our provider network include 2 to 3 tons, and 2 is the usual figure. Past that, you pay per ton from the scale ticket.
About 6½. That's 405 cubic feet at about 2.3 cubic yards for each 6½ ft bed filled level.
Only a little. Filled level with broken slab, a 15 would weigh about 17.8 tons, so concrete belongs in a 10 or a part-filled 20 quoted for heavy debris.
A 15 covers jobs of about 8 to 14 cubic yards where the market stocks one. Close to 15 yards, or with no 15 nearby, take the 20. You can load either one by hand over the side.
Our 15-yard orders had a median of 10 days included, and 7 days was the most common. Need longer? The quote shows the daily rate after the included days.
Comparing quotes
Most 15-yard quotes are a flat rate per haul. Because the included tons are low, usually 2, the per-ton overage is the number to compare across quotes. Our 15-yard orders had a median of 10 days included, and 7 days was the most common.3
For the full list of fees a 15 can pick up, see how dumpster rental is billed, with a sample invoice.
There are no prices on this page. The rate, the tons and the days for a 15 depend on the provider and the market, and the written quote shows each one.
Market availability
321 providers in our network delivered 15-yard containers from October 2024 through October 2026, against 886 for 20s. Many markets skip the 15 and go straight from a 10 to a 20. Where that's the case, we'll quote a 20 with the tons your job needs.3 Check your state's coverage page.
Send the ZIP and the job. We'll check who stocks a 15 near you and quote it, or a 20 with matching tons.