20 yard dumpster
A 20 yard dumpster holds 540 cubic feet, or nine pickup truck loads, in a container with walls low enough to load by hand. It's the usual pick for roof tear-offs, single-room remodels, decks and garage cleanouts.
Last reviewed October 27, 2026.
Dimensions
A pickup truck load is a standard 6½ ft truck bed filled level, about 2.3 cubic yards.
Most 20-yard quotes include 2 to 4 tons, and the median is 3. Across 5,895 20-yard orders our provider network delivered from October 2024 through October 2026 with tons on the quote, the middle half fell between 2 and 4 tons included, and 2 tons was the single most common figure.3
Before it arrives
At 22 ft 9 in to 23 ft long and 4 ft 3 in to 4 ft 7 in tall, a 20 takes the length of a long driveway, and you can toss debris over the side. The truck is longer still: its hoist alone runs 23½ to 25½ ft.14
Pick firm, level ground and stay at least 10 ft from power lines. Many contractors lay plywood or boards under the rails and rollers to spread the load on asphalt and pavers. That's common contractor practice, not a manufacturer requirement.5
A container on a public street usually needs a permit; rules vary by locality. Hazardous waste, batteries, asbestos, refrigerant appliances, tires and liquids stay out.6

Outside, it's about 22 ft 9 in to 23 ft long, 7 ft 9 in to 8 ft wide and 4 ft 3 in to 4 ft 7 in tall. Inside walls are 3 ft 5 in to 3 ft 10 in high. Each manufacturer's numbers differ a little.
Typically 3 tons. Most quotes in our provider network fall between 2 and 4, and the scale ticket sets any overage past the included tons.
Yes, part way. The 20 is the container our provider network used most for concrete: 514 of 958 concrete deliveries. Filled level with broken slab, it would be about 23.7 tons, so the load stops at the provider's fill line.
Usually. About 25 squares of single-layer shingles fits on roughly 3 tons included. For a multi-layer tear-off, plan a swap.
The median across our 20-, 30- and 40-yard orders was 14 days, with 7, 14 and 30 days most common. The daily rate after that is on your quote.
Weight check by material
Household trash and lumber fill a 20 before they weigh 3 tons. Mixed debris, drywall and shingles get there first, which is why roofers plan a swap.73
| Debris | Lb per loose cu yd | In a 20 at 3 tons |
|---|---|---|
| Clean lumber | 169 | Fills by volume first; level full is about 1.7 tons |
| Household trash | 275 | Fills by volume first; level full is about 2.8 tons |
| Mixed construction | 417 | Reaches 3 tons at about 14.4 cu yd, 72% full |
| Drywall | 467 | Reaches 3 tons at about 12.8 cu yd, 64% full |
| Asphalt shingles | 731 | Reaches 3 tons at about 8.2 cu yd, 41% full |
Every debris type, heavy ones included, is in the dumpster size guide tables.
Size and weight check
The 20 is where most remodel and roofing loads land. Choose a material and slide to your volume; the meter shows how close you get to the 3 tons most 20-yard quotes include.73
Your load
Within a typical quoteFits, with weight to spare.
About 2.5 tons of mixed construction, inside the typical 3 tons included on a 20. You would reach 3 tons at about 14 cubic yards.
Too small or too big
A 150 sq ft kitchen gut is about 23 cubic yards. That is past a 20 by volume: use a 30. If you're keeping the walls and ceiling, you'll produce far less, and a 20 may be enough.
Dense debris uses up the weight allowance first. A bigger container only adds empty space you pay to haul. A single-layer roof stays within about 25 squares at 3 tons included.
Keep a 20 to a partial fill on a heavy-debris quote. It was the container our network used most for concrete: 514 of 958 concrete deliveries, then the 10 (242) and the 10-yard heavy-load box (97).
Billing
Most quotes in our provider network are a flat rate per haul. That rate covers delivery, pickup, disposal up to the tons included and a set number of rental days. Across our 20-, 30- and 40-yard orders, the median rental period was 14 days, and 7, 14 and 30 days were the most common.3
How dumpster rental is billed walks through each possible charge on a sample invoice.
Rates, tons included and rental days vary by provider, market and material. We don't publish prices on this page. Your written quote lists every rate that applies to your job.
Size comparison
| Size | Length | Width | Height | Volume | Tons included |
|---|---|---|---|---|---|
| 15 yard | 14′9″ to 16′9″ | about 8 ft | 4′7″ to 4′10″ | 405 cu ft | 2 to 3 |
| 20 yard (this page) | 22′9″ to 23′ | 7′9″ to 8′ | 4′3″ to 4′7″ | 540 cu ft | 2 to 4 |
| 30 yard | 22′9″ to 23′ | 7′9″ to 8′ | 5′11″ to 6′2″ | 810 cu ft | 2 to 4 |
Same footprint as a 30, with walls about a foot and a half lower.13
Send us the job, the material and the ZIP. We quote the rental period, tons included, overage and daily rate, then schedule the drop.