The tallest roll-off: walls up to eight feet on the same footprint as a 20. 1,080 cubic feet, or about 17 pickup loads, for whole-house remodels, commercial builds and demolition.
Last reviewed October 27, 2026.
Dimensions
Quotes typically include 3 to 5 tons, and 4 tons is both the median and the most common. That's from 4,126 40-yard orders with tons on the quote that our provider network delivered from October 2024 through October 2026.2
Size and weight check
Pick the material and how much of it you have. We estimate the weight from loose weight per cubic yard and compare it with the tons a typical quote includes.4
Your load
Over the allowanceAbout 1.8 tons over a typical quote.
Weight past the included tons is billed per ton from the scale ticket, and an overloaded container may not be removed. Plan a swap at about 19 cubic yards, or ask for more tons included.
Too small or too big
Use 10-yard heavy-debris containers. A full 40 of broken concrete would exceed legal truck weight.
Two 30s can beat one 40 where height or access is the constraint.
Roofing, bathrooms and decks suit a 20. Kitchens and smaller cleanouts suit a 30. A single-layer roof stays within about 25 squares at 3 tons included.
Before it arrives
The truck needs access width, a straight run to back in and overhead clearance to tip the container off.11 Pick firm, level ground, protect pavers and asphalt, and stay at least 10 feet from power lines.10 Many contractors lay plywood or boards under the rails and rollers to spread the load on asphalt and pavers. That's common contractor practice, not a manufacturer requirement.
A container on a public street usually needs a permit; rules vary by locality. Hazardous waste, batteries, asbestos, refrigerant appliances, tires and liquids stay out.13
Every quote should give the rental period, tons included, the per-ton overage rate and the daily rate after the period ends. Rates, tons and days vary by provider and market.
Size comparison
| Size | Length | Width | Height | Volume | Tons included |
|---|---|---|---|---|---|
| 10 yard | about 14 ft 9 in | about 8 ft | about 4 ft | 270 cu ft | 1 to 3 |
| 20 yard | 22′9″ to 23′ | 7′9″ to 8′ | 4′3″ to 4′7″ | 540 cu ft | 2 to 4 |
| 30 yard | 22′9″ to 23′ | 7′9″ to 8′ | 5′11″ to 6′2″ | 810 cu ft | 2 to 4 |
| 40 yard (this page) | 22′9″ to 23′ | 7′9″ to 8′ | 7′7″ to 8′ | 1,080 cu ft | 3 to 5 |
Approximate outside dimensions from manufacturer spec sheets; included tons from quotes in our provider network. Both vary by provider and market.12
Outside, about 22 ft 9 in to 23 ft long, 7 ft 9 in to 8 ft wide and 7 ft 7 in to 8 ft tall, holding 1,080 cubic feet. Inside walls run 6 ft 9 in to 7 ft 8 in.
Quotes typically include 3 to 5 tons; 4 is both the median and the most common. Weight over the included tons is billed per ton from the scale ticket.
No. Concrete, brick, asphalt and dirt go in 10-yard heavy-debris containers. A full 40 of broken concrete would exceed legal truck weight.
A 1,500 sq ft wood-frame house without its foundation takes about eight 40s, plus heavy-debris containers for the foundation.
We cover every US state, but not every market stocks a 40. Send us the ZIP and dates and we'll confirm it on your quote, or suggest two 30s.
Market availability
In our records, 40-yard deliveries came from 319 providers from October 2024 through October 2026. Not every market stocks a 40. Where 40s are scarce, we can plan 30s with a faster swap cadence.2 Check your state's coverage page.
Billing
Most quotes in our provider network are a flat rate per haul. That rate covers delivery, pickup, disposal up to the tons included and a set number of rental days. Across our 20-, 30- and 40-yard orders, the median rental period was 14 days, and 7, 14 and 30 days were the most common.2 A second model is a base rate plus per-ton disposal from the scale tickets. Ask about swap delivery, dry-run, relocation, overfill, permit and special-item charges.
Charges you might see: tonnage overage from the scale ticket, extra days, a swap or extra haul, a dry run when the spot is blocked, relocation on site, special items, overfill, contamination, permit fees, and fuel, environmental or disposal surcharges.
For a sample invoice with the amounts left off, see how dumpster rental is billed.
Rates, tons included and rental days vary by provider, market and material. We don't publish prices on this page. Your written quote lists every rate that applies to your job.
| Debris | Pounds per loose cubic yard | Source |
|---|---|---|
| Clean lumber | 169 | US EPA4 |
| Mixed household trash, loose | 250 to 300 | US EPA4 |
| Mixed construction debris | 417 | US EPA4 |
| Drywall | 467 | US EPA4 |
| Asphalt shingles (tear-off) | 731 | US EPA4 |
| Concrete pieces, as hauled | 860 | US EPA4 |
| Dirt and sand, as hauled | 929 | US EPA4 |
| Topsoil, dug and loose | 1,620 | FHWA9 |
| Earth (loam), dug and loose | 2,070 to 2,360 | FHWA9 |
| Broken concrete slab, loose | 2,370 | FHWA9 |

Send us the job, the material and the ZIP. We quote the rental period, tons included, overage and daily rate, then schedule the drop.