Demolition, earthwork and cutting make dust, and dust brings complaints, citations and health risks. We source water trucks, misting and air scrubbing equipment from local providers, schedule it with the work and keep it on one agreement with your other site services.

Worker exposure
OSHA's silica standard lists engineering controls for common tasks. Examples include water-fed saws, shrouded drills and HEPA-filtered vacuums.1
| Task | Control in the standard |
|---|---|
| Handheld and walk-behind saws | A saw with an integrated water delivery system that continuously feeds water to the blade |
| Drilling | A drill with a commercially available shroud or cowling and a dust collection system, and a HEPA-filtered vacuum when cleaning holes |
| Grinding | Grinders with a commercially available shroud and dust collection system |
| Housekeeping | No dry sweeping or dry brushing where it could expose workers, unless wet sweeping, HEPA vacuuming or other methods are not feasible |
The standard has more rows and respirator requirements that vary by task. Read it for your work, and talk to your safety lead.
Tell us the work, the area and the neighbors. We source water trucks, misting and air scrubbing equipment.
Neighbors and regulators
Many places regulate dust at the property line. Maricopa County, Arizona, for example, tells contractors that the opacity of dust emissions from dust generating operations cannot exceed 20 percent, that no visible dust may cross the property line, and that water should be applied to control emissions before, during and after earthmoving.2 Your county or air district may have different rules and may require a dust control plan or permit, so check before you start and write it into the schedule.
Planning
Controls work best when they are planned with the work.
Apply water where dust starts, before, during and after the dust making task, and keep roads and stockpiles damp.
Use saws with water, shrouded drills and HEPA vacuums where the standard calls for them.
Air scrubbers with ducting help in open building shells and finishing phases.
Keep mud off the street. See wheel wash and track-out, construction site checklist and concrete washout.
Common questions
Engineering controls for common tasks, such as saws that feed water to the blade, drills with a shroud and dust collection, and HEPA vacuums, plus no dry sweeping where it could expose workers.
Misting or hoses, water trucks and covered or damp stockpiles, with capture at the tool and clean-up that does not blow dust around.
A written plan some counties and air districts require for earthmoving and construction, describing how you will control dust. Check yours before you start.
They remove particles from the air indoors, especially in open shells and during finishing. They do not replace controls at the source.
We source them through local providers. Tell us the site and the dates.
Call sales at (888) 588-2607 or request a quote.
Local providers do the work; we hold the contract, own the problems, and send one bill. If a delivery gets missed, we contact the provider the same business day.