Waste and recycling · All 50 states and DC

National dumpster rental, sized by weight.

Locally sourced, nationally managed. We match each job to a local hauler, then size the container by what goes in it, because weight is where most dumpster quotes go wrong.

  • Updated October 9, 2026
30 ydMost placed sizeLowboyConcrete, dirt, asphaltBulky, light C&D debris
  • LowboyConcrete, dirt, asphalt
  • 30 yardBulky, light C&D debris
Containers delivered
66,368
Local haulers used
1,515
States and DC
51
Standard sizes
10 to 40yd

Delivered container records in the Detritus provider network. Hauler counts overlap across sizes, so they don't add up.


Sizes

Sizes, with what we've actually placed.

The 30 yard is the workhorse. The size number is the capacity in cubic yards, loaded level with the top rails.

10 yd15 yd20 yd30 yd40 yd5,0753,76513,96130,2508,830
Typical proportions; exact dimensions vary by hauler. Figures are containers delivered.
SizeDeliveredShareHaulersStatesTypical use
30 yard30,2501,51551Most-placed size: commercial shells, multi-family, demolition, land clearing
20 yard13,9611,28350General purpose: remodels, mid-scale framing debris, part-filled heavy loads
40 yard8,83045641Largest standard: warehouse cleanouts, large commercial, fewer hauls
10 yard5,07560143Tight access and dense debris
15 yard3,76551545Between a 10 and a 20; fits where a 20 won't
12 yard1,27817436Limited supply; we often propose a 15 or 20 instead
10 yard lowboy8677319Built for heavy debris like concrete, dirt and asphalt; usually quoted at a flat inert rate with a hard weight cap
Dump trailers, 10 to 20 yard4813717Sites where a roll-off truck can't get in or turn around

States counts include DC. We also place smaller and specialty sizes: 3, 6, 16, 17, 18 and 25 yard.

The rule that saves the most money

Never put pure concrete or dirt in a 40 yard.

A 40 yard of inert material is over legal truck weight long before it's full, so it can't be collected. The container our provider network uses most for concrete is a 20 yard filled part way: 514 of 958 concrete deliveries from October 2024 to October 2026. Next came the 10 yard (242), the 10 yard lowboy (97) and the 15 yard (55).

In a 20, fill it only part way and check the tons included. Across the 862 concrete orders that listed tons, the median included 10.

A vendor who quotes a 40 for concrete either hasn't checked the material or plans to charge you a return trip. We correct the order instead of delivering a box nobody can haul.

40 yd of concreteAbout 47 tons loose. Can't legally be hauled.10 yd lowboyFlat inert rate, hard weight cap
  • 40 yd of concreteAbout 47 tons loose. Can't legally be hauled.
  • 10 yd lowboyFlat inert rate, hard weight cap
Weight from FHWA loose density for broken concrete, about 2,370 lb per cubic yard.

Size by material

What's going in decides the box.

Light, bulky debris fills a container before it gets heavy. Dense material gets heavy before it fills anything.

MaterialSizeWhy
Construction and demolition30 or 40 yardBulky and light; fills before it weighs out, so bigger cuts haul count
Concrete, brick, asphalt20 yard filled part way, or a 10 or 10 yard lowboyWeight-capped; can't legally go in a large box
Dirt and fill10 or 20 yardSame weight limit as concrete
Roofing shingles10 to 20 yard, sized by squaresDense; ask for tons included to be raised above the default
Green and landscape waste20 or 30 yardBulky, but wet material adds weight quickly
Wet or storm debrisOne size downWater adds weight fast

Comparing quotes

Four numbers make a complete price.

A base rate without these four is a haul price, not an all-in price. Every quote we send states all four.

  1. 01

    Rental period

    Days included in the base price. Real terms in our records run 7 to 30 days.

  2. 02

    Tons included

    From 2 tons on a 10 yard up to 10 tons on a 30 yard sized for concrete.

  3. 03

    Per-ton overage

    Charged for every ton over the included weight, billed from the scale ticket. It varies by market and material. This is what turns a cheap quote expensive.

  4. 04

    Daily rate after

    Charged once the rental period ends. On construction jobs, pickup happens when you call, so this is where budgets drift.

Terms are defined in the glossary. The full sizing logic is in the dumpster size guide, with dimensions for a 20 yard, 30 yard and 40 yard roll-off, and published city rates on the commercial dumpster cost guide. To compare quotes line by line, use dumpster rental fees explained.

One container or a program

Built for multi-site work.

Programs and multi-site work

Swap scheduling, consolidated billing and one escalation path across every market you work in. One agreement, local haulers everywhere.

Start hereGet a quote →

A single container

One dumpster for one job? Book it through our single-job brand, Dumpster Rental Dogs.

Single jobsdumpsterrentaldogs.com ↗

Recurring collection is a different container

The sizes on this page are roll-offs for a project or a cleanout. Occupied buildings usually need a container that stays and is emptied on a schedule. That service, including front-load dumpsters, rear-load, and compactors, is commercial waste collection. Stationary and self-contained compactors, and cardboard balers, are on compactors and balers. The comparison of sizes and billing is front-load vs roll-off. A roll-off can also sit beside a compactor or baler that is down until the machine is repaired.

Get a dumpster quote.

Send the address, the material and the dates. We come back with a size, tons and days included, and a price from a local hauler.

Questions

Common questions.

What size dumpster do I need?

Size by weight, not volume. That is the whole answer.

  • Light bulky debris such as framing and drywall fills a 30 or 40 yard before it weighs out
  • Concrete, dirt, asphalt, and shingles hit the weight limit long before the box looks full, so they go in a 10 or 20 yard, often part filled
  • Our most-placed size is the 30 yard, then the 20

Can I put concrete or dirt in a 40 yard dumpster?

No. A 40 yard of pure inert material cannot legally be hauled.

  • It exceeds truck weight limits before it is full
  • Our provider network uses a 20 yard filled part way most often, then a 10 yard or a 10 yard lowboy
  • We correct the order rather than deliver something that cannot be collected

What does tons included mean?

The disposal weight bundled into the base price. Above it, you pay per ton from the scale ticket.

  • A quote with no stated tonnage is a haul price, not an all-in price
  • Real inclusions run from 2 tons on a 10 yard to 10 tons on a 30 sized for concrete
  • The per-ton overage rate depends on market and material, so get it in writing

How long can I keep the dumpster?

As long as you need. Past the rental period you pay an additional daily rate.

  • On construction we do not set a fixed removal date, because collection happens when you call
  • That makes the additional daily rate the number to watch
  • We state it on every quote rather than leaving it in the terms

How many dumpsters do I need for a roofing job?

Count squares, then size down. Shingles are weight-limited.

  • A 20 yard handles roughly 55 squares of single-layer shingles
  • A 10 or 12 yard handles roughly 25 to 30
  • Multi-layer tear-offs cut those figures substantially
  • Ask for tons included to be raised, because the default is set for lighter debris

Do you handle separated recycling and hazardous material?

Yes, and they are handled differently from each other.

  • Separated streams for metal, concrete, plastic, wood pallets, and cardboard
  • Worth doing where the material has value or a diversion target applies
  • Regulated material is handled separately with documentation. Never put liquids, fuels, batteries, pesticides, or asbestos in a standard roll-off