Site services · Sourced through our provider network
Office trailer rental.
A lockable room on site, sourced from a local provider. We handle the dates, delivery and billing in one place.
125 amp inside, a disconnect outside, on the units we looked at
A through-wall heat and cool unit
Steps, and a ramp if the public uses it
What you can rent
Three kinds of site office.
Container office
A converted steel container set on the ground. Secure and weather-tight.
Office and storage combo
One container split into an office end and a lockable storage end.
Wheeled office trailer
Rides on a towable frame, with more space and rooms.
What we’ve placed
34 site offices in 18 states over two years.
Site offices delivered
States
Median stay, all office types
Median stay, container offices
Updated October 29, 2026. Counts cover office units delivered October 26, 2024 through October 26, 2026, canceled orders excluded. Stay length runs from delivery to pickup on the 26 units that had gone back, 17 of them container offices. The middle half of those stays ran 55 to 118 days.
What comes inside
Two 20 foot container offices, spec by spec.
| Spec | Builder A | Builder B |
|---|---|---|
| Outside | 8 ft wide, 19 ft 10.5 in long, 8 ft 6 in high | 20 ft container, standard height |
| Inside | 7 ft wide, 18 ft 6 in long, 7 ft 4 in high | Insulated wall panels, 2 3/4 in thick |
| Electrical | 125 amp panel with a 60 amp exterior disconnect, six duplex 110 volt outlets | 125 amp breaker box, an exterior junction box, five plug outlets and one switched outlet |
| Heat and cooling | Through-wall unit, 15,000 BTU cooling and 3.5 kW heat | 8,000 BTU heat pump on 110 volts, with a 12,000 BTU, 220 volt upgrade |
| Windows | Three, 3 ft by 3 ft | Three 36 in sliders with security bars |
| Door | One 3 ft personnel door with a light beside it | One steel door, 3 ft by 6 ft 8 in, with a 3 hour fire rating |
| Lights | Two 4 ft LED fixtures | Two 4 ft fluorescent fixtures |
Both have a 125 amp panel inside. One adds a 60 amp disconnect outside, which is what the electrician or generator connects to.
Check the air unit’s BTU rating against the room and its power draw against your plan.
Office steps and ramp calculator
How far up is the door, and what does that call for?
Straight ramp with landings
Riser count assumes about 7½ inches a step. A ramp is needed when the office has to be accessible.
The rules behind the numbers
Steps for your crew. A ramp when the office has to be accessible.
Slope
1:12 at most: one foot of ramp for every inch of rise.
Rise per run
No more than 30 inches before a landing.
Landings
Level, at the top and bottom of every run, at least 5 feet long.
Width and rails
36 inches clear between rails; handrails on both sides above 6 inches of rise.
The door
OSHA wants stairs or a ladder at a 19 inch step or more when there’s no ramp.
The exemption
A construction trailer used for the work itself is generally exempt from ADA. A public-facing office is not.
Before it arrives
Five things to sort out before delivery day.
A level, firm spot
Gravel or compacted ground, clear of overhead lines.
A clear path in
Room for the truck to set it and pull away.
A power plan
A licensed electrician or a generator, and who is connecting it.
Keys and furniture
Who holds keys, and whether desks come with it.
The building department
Some places want a permit for a placed structure.
Next step
Get an office quote.
Send the dates, the address and what the office is for.
Questions
Questions about site offices.
What's the difference between a container office and an office trailer?
A container office is a converted steel shipping container set on the ground. An office trailer is built on a frame with axles and a hitch and gets towed in. A trailer can give you more floor space and more rooms. A container sits lower and has steel walls.
How long do people rent a site office?
In our network the median stay is 77 days, from delivery to pickup, and the middle half of stays ran 55 to 118 days. That's 26 units delivered between October 2024 and October 2026 that had already gone back.
Does a construction site office have to be ADA accessible?
Not under the 2010 ADA Standards when it's a construction trailer used for the work itself; section 203.2 exempts it. An office the public uses, like a sales or leasing office, is another matter, so check with the building department.
Do I need stairs for an office trailer?
OSHA calls for a stairway or ladder when the step up is 19 inches or more and there's no ramp. Stairs with four or more risers, or that rise more than 30 inches, need a handrail and a stairrail on each open side.
What power does a container office need?
The units we looked at have a 125 amp panel inside, and one has a 60 amp disconnect outside. A licensed electrician connects site power to it, or a generator does. Ask the provider for the exact connection on the unit you're getting.
Read next
Sources
- Manufacturer spec pages, checked October 29, 2026: Falcon Structures 20 ft Shipping Container Office (exterior 8 ft by 19 ft 10.5 in by 8 ft 6 in; interior 7 ft by 18 ft 6 in by 7 ft 4 in; 125A capacity panel with 60A exterior disconnect; six duplex 110V outlets; two 4 ft LED fixtures; PTAC with 15k BTU cooling and 3.5 kW heating; three 3 ft by 3 ft windows; one 3 ft personnel door with exterior light) falconstructures.com; ModalART 20 ft Office Container and 40 ft Office Combo, new container builds (three 36 in by 36 in sliders with security bars; 3068 door with 3 hour fire rating; 2 3/4 in R-13 panels; 8,000 BTU heat pump at 110 volts, upgradable to 12,000 BTU at 220 volts; five plug outlets, one switch outlet, 125 amp breaker box, exterior junction box; two 4 ft fluorescent fixtures; 40 ft combo with 16 ft office and 24 ft storage) modalart.com.
- 29 CFR 1926.1051(a), General requirements for stairways and ladders: a stairway or ladder at all personnel points of access where there is a break in elevation of 19 inches or more, and no ramp, runway, sloped embankment, or personnel hoist is provided. Checked October 29, 2026. ecfr.gov
- 29 CFR 1926.1052(c)(1), Stairways: stairways having four or more risers or rising more than 30 inches, whichever is less, shall have at least one handrail and one stairrail system along each unprotected side or edge. Checked October 29, 2026. ecfr.gov
- US Access Board, 2010 ADA Standards for Accessible Design: 203.2 construction sites, including construction trailers, not required to comply or be on an accessible route; 404.2.3 door clear width 32 inches minimum; 405.2 running slope not steeper than 1:12; 405.5 ramp clear width 36 inches minimum; 405.6 rise 30 inches maximum per run; 405.7 landings at the top and bottom of each run, 60 inches long minimum, 60 by 60 inches at a change in direction; 405.8 handrails where a run rises more than 6 inches; 505.2 handrails on both sides of ramps; 505.4 handrail height 34 to 38 inches. Checked October 29, 2026. access-board.gov
- Duke Energy, Requirements for Electric Service and Meter Installations, April 2026: for temporary construction service, the company holds the application for inspection, line construction when needed requires a minimum of 10 business days, and the authority having jurisdiction inspects the temporary meter base and notifies the company before the meter is installed. duke-energy.com
- Detritus provider network order records: office units delivered October 26, 2024 through October 26, 2026, canceled orders excluded; stay length from delivery to recorded pickup. Pulled October 29, 2026.