Panel and chain-link fencing, gates, screen, and barricades. Fencing carries longer lead times than sanitation and waste, and it is the line most often discovered late, after a safety walk or a permit condition.
| Option | Used for |
|---|---|
| Panel fencing | Faster to install and relocate. Shorter runs and changing work fronts |
| Chain link with anchored posts | Long-duration perimeters where security matters more than flexibility |
| Privacy screen | Available on either. Often a permit or neighbour-relations requirement rather than a choice |
| Construction gates | Pedestrian and vehicle access points. Specify width and how many |
| Barricades and cones | Traffic and pedestrian control around active work, including bike barricades |
Linear footage and duration, with delivery, installation, and removal usually quoted separately. Gates, privacy screen, and anchoring are line items, not assumptions. A real order in our record was 300 linear feet of 6-foot fence with double sandbags, quoted alongside a porta, a dumpster, an office trailer, and a generator on the same agreement.
Fencing carries longer lead times than sanitation and waste because it needs measurement, an install crew, and usually a layout conversation. It is also the line most likely to be discovered late, after a safety walk or a permit condition. Scope it with the rest of the program before mobilization rather than after.
Single fence orders book faster through Construction Fencing Dogs. This page is for sites where fencing is one line among several.
Linear footage, height, how many gates and where, whether you need privacy screen, and the duration. If you have a site plan, send it. If you are already running restrooms or containers with us, this goes on the same agreement and the same invoice.
How is temporary fencing priced?
By linear footage and duration, with delivery, installation, and removal usually separate.
Panel fence or chain link?
Panel for speed and flexibility. Chain link for security and duration.
How far ahead should fencing be ordered?
Earlier than sanitation and waste.
Do you supply barricades and traffic control?
Barricades, channelizing devices, bike barricades, and cones, sourced alongside fencing.